Form Center

By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

50/50 Sidewalk Replacement Request

  1. Applications will be accepted until: for summer construction. You will be notified of your share of the cost by mail as soon as the contract is let. At that time, you may either deposit your share within fifteen (15) days, or withdraw your request.
  2. 555-555-5555
  3. The Town of Normal, by resolution in November 1964, adopted the following policy:
    1. To enter into a sidewalk replacement program with 50/50 cost sharing with property owners.

    2. Construction to be done by contract with the Town to the Town’s standards.

    3. Town to participate to the extent that money is available.

    4. Priorities are established in case the requests exceed available funds.
  4. I have read the above*
  5. By typing my name I am electronically signing this application.
  6. Leave This Blank:

  7. This field is not part of the form submission.